PRS Number PRS Name HSWA      SWMU NFA Proposed Document Title LAUR     No * Virtual Reading Room?
54-001(a) Storage area Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-001(b) Storage area No No RFI Work Plan for OU 1148 92-0855 Yes
54-001(c) Storage area Yes - Removed Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-001(d) Storage area No No RFI Work Plan for OU 1148 92-0855 Yes
54-001(e) Storage area No No RFI Work Plan for OU 1148 92-0855 Yes
54-001(f) Storage area No Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-002 Storage area (gas cylinder storage area) No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-004 Material disposal area (MDA H)  (except sh. 9) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-005 Material disposal area (MDA  J) (Pits 1-5, Shafts 1-4) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-006 Material disposal area (MDA L)  (All subsurface units such as Pit A, SI B,C,D Shafts 1-28, 29-34) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-007(a) Septic system(tank and seepage trench) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-007(b) Septic system Yes Yes RFI Work Plan for OU 1148 92-0855 Yes
54-007(c) Septic system Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-007(d) Septic system No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-007(e) Septic system No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-008 Underground tank No Yes RFI Work Plan for OU 1148 92-0855 Yes
54-009 Aboveground tanks (treatment tanks) No No RFI Work Plan for OU 1148 92-0855 Yes
54-010 Underground tank (supply wash-water tank) No Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-012(a) Reduction site (drum compactor) No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-012(b) Reduction site Yes No RFI Work Plan for OU 1148 92-0855 Yes
54-013(a) Decontamination facility (not built) Yes - Removed Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-013(b) Material disposal area  (MDA G) Disposal Pit (truck washing pit converted to Pit 19) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-014(a) Material disposal area (MDA L) Storage shafts (Pb stringer shafts) No No RFI Work Plan for OU 1148 92-0855 Yes
54-014(b) Material disposal area (MDA G) Storage pit  (Pit 9, TRU waste) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-014(c) Material disposal area (MDA G)  Storage shafts (shafts 200-233) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-014(d) Material disposal area (MDA G) Storage trenches A, B, C, D Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-015(a) Storage area (active surface corrosive inhibitor) No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(b) Storage area (TRU surface storage) No No RFI Work Plan for OU 1148 92-0855 Yes
54-015(c) Storage area, TRU Pad 1 No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(d) Storage area, TRU Pad 2 No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(e) Storage area, TRU Pad 3 No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(f) Storage area, TRU Pad 4 No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(g) Storage area (Pb casks near shaft 4) No Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(h) Storage area (drums) Yes Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(i) Storage area -forklift battery No Yes RFI Work Plan for OU 1148 92-0855 Yes
54-015(j) Storage area (Dome #49, mixed waste sludge) No No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-015(k) Storage area(TRU waste mound) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-016(a) Sump No Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-016(b) Sump No No RFI Work Plan for OU 1148 92-0855 Yes
54-017 Material disposal area (MDA G) Disposal pits 16,22 (active before 11/19/80) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-018 Material disposal area (MDA G)Disposal pits 27-33,35-37 (active after 11/19/80) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-019 Material disposal area (MDA G) Disposal shafts (active before 11/19/80) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-020 Material disposal area (MDA G) Disposal shafts  (active after 11/19/80) Yes No RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
RFI Report for Material Disposal Areas G, H, and L at Technical Area 54 00-1140 No
54-021 Aboveground oil storage tanks (6) No Yes RFI RPT TA 54:  Channels from MDAs G,H, J, L (See Sed RFI RPT) PRSs 54-001(a,c,f), 54-002, 54-004, 54-005, 54-006, 54-007(a, c-e), 54-010, 54-012(a), 54-013(a,b), 54-014(b-d), 54-015(a, c-h, j, k,),  54-016(a), 54-017, 54-018, 54-019, 54-020, 54-021, C-51 96-0110 No
RFI Work Plan for OU 1148 92-0855 Yes
54-022 Transformer spill (PCB)  - PCB only site No Yes RFI Work Plan for OU 1148 92-0855 Yes