PRS Number PRS Name HSWA      SWMU NFA Proposed Document Title LAUR     No * Virtual Reading Room? TA
00-003 Container storage, Western Steam Plant Yes Yes RFI RPT TA 00:  PRS 0-003, 0-012, Western Steam Plant 97-3828 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan for Potential Release Sites 0-003, 0-012, and 0-030(i) 99-5671 No 00
00-004 Container storage, 6th St. Warehouses (inactive) No Yes RFI RPT TA 0:  PRSs 0-030(b), 0-033(b), 0-004, 0-010(b) 96-1749 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-005 Landfill Yes - Removed Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-008 Surface disposal site No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-010(a) Surface disposal site No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-010(b) Surface disposal site, 6th St. Warehouses No Yes RFI RPT TA 0:  PRSs 0-030(b), 0-033(b), 0-004, 0-010(b) 96-1749 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-011(a) Mortar impact area Yes Yes RFI Phase Report for OU 1071, SWMU Aggregate O-D (ordnance impact areas)PRSs 0-011(a, c, d, e) and C-0-020 No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-011(c) Mortar impact area Yes Yes RFI Phase Report for OU 1071, SWMU Aggregate O-D (ordnance impact areas)PRSs 0-011(a, c, d, e) and C-0-020 No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-011(d) Mortar impact area Yes Yes RFI Phase Report for OU 1071, SWMU Aggregate O-D (ordnance impact areas)PRSs 0-011(a, c, d, e) and C-0-020 No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-011(e) Mortar impact area Yes Yes RFI Phase Report for OU 1071, SWMU Aggregate O-D (ordnance impact areas)PRSs 0-011(a, c, d, e) and C-0-020 No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-012 Underground tank, Western Steam Plant Yes Yes RFI RPT TA 00:  PRS 0-003, 0-012, Western Steam Plant 97-3828 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan for Potential Release Sites 0-003, 0-012, and 0-030(i) 99-5671 No 00
00-015 Firing range, Rendija Canyon (active) No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-016 Firing range (inactive) Yes Yes RFI Work Plan for OU1071 92-0810 Yes 00
Final Voluntary Corrective Action Plan TA 0: PRS 0-016 96-2040 No 00
Cleanup RPT TA 00:  PRS 0-016 97-2745 No 00
Revised VCA Completion Report for PRS 0-016, Revision 1  HSWA 97-2745 No 00
00-017 Waste lines Yes Yes RFI Report for Potential Release Site 0-017 (Former Line 167, Line 170, and Line 171) 99-3354 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-018(a) Sludge bed Wastewater treatment plantPueblo (decommissioned) Yes Yes RFI RPT TA 00:  PRS 0-018(a,b), Waste Water Treatment Plant 97-3319 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-018(b) Sludge bed Wastewater treatment plant Bayo (active) No Yes RFI RPT TA 00:  PRS 0-018(a,b), Waste Water Treatment Plant 97-3319 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-019 Wastewater treatment plant, Central Yes No RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan Addendum for Potential Release Site 0-019 99-1707 No 00
00-024 Cistern - never located No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-025 Landfill No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-026 Landfill No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-027 Storage area, DP Road No No RFI Work Plan for OU1071 92-0810 Yes 00
00-028(a) Effluent discharge, golf course (active) Yes Yes RFI  RPT TA 0:  PRSs 0-028(a,b) 96-2421 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-028(b) Effluent discharge, ball fields (active) Yes Yes RFI  RPT TA 0:  PRSs 0-028(a,b) 96-2421 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-029(a) Transformer  - PCB only site No Yes RFI RPT TA 0: PRSs 0-029(a-c) No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-029(b) Transformer  - PCB only site No Yes RFI RPT TA 0: PRSs 0-029(a-c) No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-029(c) Transformer  - PCB only site No Yes RFI RPT TA 0: PRSs 0-029(a-c) No No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-030(a) Septic system, DP Road Yes Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRS 0-030(a) 96-1290 No 00
Voluntary Corrective Action Report for SWMU 0-030(a) 96-3203 No 00
00-030(b) Septic system 6th St  (inactive) Yes Yes RFI RPT TA 0:  PRSs 0-030(b), 0-033(b), 0-004, 0-010(b) 96-1749 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
Final Voluntary Corrective Action Plan TA 0:  PRSs 0-033(b), 0-030(b) 96-2385 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(b), 0-033(b) No No 00
00-030(c) Septic system No Yes RFI RPT TA 0: PRSs 0-030(c), 0-030(q) 95-2079 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-030(d) Septic system No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
Cleanup RPT TA 00:  PRS 0-030(d,k), C-0-043 Two cleanups, one NFA 97-3318 No 00
00-030(e)N Septic system No Yes RFI RPT TA 0: PRSs 0-030(eN, eS,f) 96-2135 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-030(e)S Septic system No Yes RFI RPT TA 0: PRSs 0-030(eN, eS,f) 96-2135 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-030(f) Septic system No Yes RFI RPT TA 0: PRSs 0-030(eN, eS,f) 96-2135 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-030(g) Septic system (near old Catholic Church parking lot) Yes Yes RFI RPT TA 0:  PRS  0-030(g)    Approval upon modification 95-3263 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-030(h) Septic system (near new Catholic Church) No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(h,i,n,o,p) 96-3351 No 00
00-030(i) Septic system No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(h,i,n,o,p) 96-3351 No 00
Voluntary Corrective Action Plan for Potential Release Sites 0-003, 0-012, and 0-030(i) 99-5671 No 00
00-030(j) Septic system No No RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
00-030(k) Septic system No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
Cleanup RPT TA 00:  PRS 0-030(d,k), C-0-043 Two cleanups, one NFA 97-3318 No 00
00-030(l) Septic system, 6th St. Warehouses (active) Yes Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Report TA 0:  PRSs 0-030(l,m), 0-033(a) 96-2901 No 00
00-030(m) Septic system, 6th St. Warehouses (active) Yes Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Report TA 0:  PRSs 0-030(l,m), 0-033(a) 96-2901 No 00
00-030(n) Septic system No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(h,i,n,o,p) 96-3351 No 00
00-030(o) Septic system No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(h,i,n,o,p) 96-3351 No 00
00-030(p) Septic system No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(h,i,n,o,p) 96-3351 No 00
00-030(q) Septic system No Yes RFI RPT TA 0: PRSs 0-030(c), 0-030(q) 95-2079 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-031(a) Soil contamination beneath former service station No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-031(b) Soil contamination beneath former motorpool (Two USTs) No Yes RFI RPT TA 0:  PRS 0-031(b) 96-2746 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-032 Soil contamination beneath former motorpool (UST for used motor oil) No Yes RFI RPT TA 0: PRS 0-032 Non-HSWA 95-0932 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Plan for SWMU 0-032 No No 00
Final Voluntary Corrective Action Report Non-HSWA: 0-032 96-432 No 00
00-033(a) Warehouses, 6th Street (UST removal) Yes Yes RFI Work Plan for OU1071 92-0810 Yes 00
Voluntary Corrective Action Report TA 0:  PRSs 0-030(l,m), 0-033(a) 96-2901 No 00
00-033(b) Oulet piping 6th Street Warehouse No Yes RFI RPT TA 0:  PRSs 0-030(b), 0-033(b), 0-004, 0-010(b) 96-1749 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
Final Voluntary Corrective Action Plan TA 0:  PRSs 0-033(b), 0-030(b) 96-2385 No 00
VCA/RFI RPTs TAs 0:  PRSs 0-030(b), 0-033(b) No No 00
00-034(a) Landfill, Eastern Area No Yes NFA  RPT TA 00, 73:  PRS 0-034(a,b), 73-001(b), 73-004(c,d) 97-3864 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-034(b) Landfill, Western Area No Yes NFA  RPT TA 00, 73:  PRS 0-034(a,b), 73-001(b), 73-004(c,d) 97-3864 No 00
RFI Work Plan for OU1071 92-0810 Yes 00
00-035(a) Surface disposal No Yes RFI Work Plan for OU1071 92-0810 Yes 00
00-039 Underground tanks - new SWMU Yes Yes RFI RPT TA 0:  PRS  0-039 96-0694 No 00
00-040 Underground tank - new AOC No Yes RFI Work Plan for OU1071 92-0810 Yes 00
C-00-020 Mortar impact area No Yes RFI Work Plan for OU1071 92-0810 Yes 00
C-00-036(a) Borrow pit 1, Bandelier NM - new AOC No Yes Voluntary Corrective Action Plan For PRSs C-0-036(a-d), 9-010(a,b) No No 00
Voluntary Corrective Action Report For PRS C-0-036(a-d)Non-HSWA 96-435 No 00
C-00-036(b) Borrow pit 2, Bandelier NM - new AOC No Yes Voluntary Corrective Action Plan For PRSs C-0-036(a-d), 9-010(a,b) No No 00
Voluntary Corrective Action Report For PRS C-0-036(a-d)Non-HSWA 96-435 No 00
C-00-036(c) Borrow pit 3, Bandelier NM - new AOC No Yes Voluntary Corrective Action Plan For PRSs C-0-036(a-d), 9-010(a,b) No No 00
Voluntary Corrective Action Report For PRS C-0-036(a-d)Non-HSWA 96-435 No 00
C-00-036(d) Borrow pit 4, Bandelier NM - new AOC No Yes Voluntary Corrective Action Plan For PRSs C-0-036(a-d), 9-010(a,b) No No 00
Voluntary Corrective Action Report For PRS C-0-036(a-d)Non-HSWA 96-435 No 00
C-00-037 Landfill, Bandelier NM - new AOC No Yes RFI Report for Potential ReleaseSites C-00-037 and C-00-038 99-4833 No 00
C-00-038 Surface disposal, Bandelier NM - new AOC No Yes RFI Report for Potential ReleaseSites C-00-037 and C-00-038 99-4833 No 00
C-00-041 Asphalt and tar remnant site No Yes RFI Work Plan for OU1071 92-0810 Yes 00
Final Voluntary Corrective Action Report Non-HSWA: C-0-041 96-434 No 00
C-00-042 tank (formerly part of 0-032) No Yes Voluntary Corrective Action PlanTA 0:  PRS C-0-042 Waste Oils Underground Storage TankNon-HSWA 96-1319 No 00
Voluntary Corrective Action Plan TA 0:  PRSs 0-030(h,i,j,n,o), 0-030(d,k,p) Town Site Septic Systems 96-936 No 00
Voluntary Corrective Action Report TA 0:  PRS C-0-042Non-HSWA 96-1319 No 00
C-00-043 Manhole (abandoned) No Yes Voluntary Corrective Action Plan TA 0:  PRS C-0-043Non-HSWA 97-301 No 00
Cleanup RPT TA 00:  PRS 0-030(d,k), C-0-043 Two cleanups, one NFA 97-3318 No 00
01-001(a) Septic tank 134 Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(b) Septic tank 135 Yes Yes RFI RPT TA 1:  AGG. C, D, PRSs 1-001(b,f), 1-003(c), 1-007(j) 96-0962 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(c) Septic tank 137 Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(d) Septic tank 138 (hillside) Yes No RFI RPT AGG. F PRSs 1-001(d),1-006(h) 95-2680 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
Submittal of Remedial Action for SWMU 1-001(d) No No 01
Revised Submittal of Remedial Action for SWMU 1-001(d) No No 01
01-001(e) Septic tank 139 Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(f) Septic tank 140 (hillside) Yes Yes RFI RPT TA 1:  AGG. C, D, PRSs 1-001(b,f), 1-003(c), 1-007(j) 96-0962 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
Voluntary Corrective Action Plan For PRS 1-001(f) No No 01
Voluntary Corrective Action Report Non-HSWA:  PRS 1-001(f) 96-473 No 01
01-001(g) Septic tank 141 Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(h) Septic tank 142 Yes - Removed Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(i) Septic tank 143 Yes - Removed Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(j) Septic tank 149 Yes - Removed Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(k) Septic tank 268 Yes - Removed Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(l) Septic tank 269 Yes - Removed Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(m) Septic tank 275 Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(n) Septic tank 276 Yes - Removed Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(o) Ind. or san. waste water treat. Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(p) Septic system No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(q) Septic system No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(r) Septic system No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(s) Septic system waste  line Yes Yes Interim Action Plan TA 1:  PRS 1-001(s) 96-2273 No 01
IA Report TA 1: PRS 1-001(s) No No 01
RFI RPT TA 01:  Agg. N & P PRS 1-001(s,u), 1-007(l) 97-3320 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(t) Septic system Yes Yes RFI RPT TA 1:  AGG. K, L, M, O,  PRSs 1-002, 1-001(t), 1-007(k).  Rejection 11/18/97 96-1264 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(u) Septic system waste line Yes Yes RFI RPT TA 01:  Agg. N & P PRS 1-001(s,u), 1-007(l) 97-3320 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(v) Septic system No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-001(w) Septic system No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-002 Outfall TA1 SWMU to be in TA45 Yes Yes RFI RPT TA 1:  AGG. K, L, M, O,  PRSs 1-002, 1-001(t), 1-007(k).  Rejection 11/18/97 96-1264 No 01
RFI RPT TA 1,45: PRSs 1-002, 45-001, 45-002, 45-003, 45-004, C-45-001 95-2077 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-003(a) Landfill Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-003(b) Surface disposal site No Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-003(c) Surface disposal site No Yes RFI RPT TA 1:  AGG. C, D, PRSs 1-001(b,f), 1-003(c), 1-007(j) 96-0962 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-003(d) Surface disposal site (Can dump) Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
Voluntary Corrective Action Plan For SWMU 1-003(d) No No 01
VCA Report TA 1:  PRS 1-003(d) 8/21/96 rept date 96-1561 No 01
01-003(e) Surface disposal site Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-004(a) Incinerator No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-004(b) Incinerator No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-005 Incinerator No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(a) Drain lines and outfall Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(b) Drain lines and outfall Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(c) Drain lines and outfall Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(d) Drain lines and outfall Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(e) Drain lines and outfall No Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(f) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(g) Drain lines and outfall No Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(h) Drain lines and outfall Yes Yes RFI RPT AGG. F PRSs 1-001(d),1-006(h) 95-2680 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(i) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(j) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(k) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(l) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(m) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(n) Drain lines and outfall Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(o) Storm Drain System Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(p) Drain lines and outfall No No RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(q) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(r) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(s) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-006(t) Drain lines and outfall No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(a) Soil contamination area Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(b) Soil contamination area Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(c) Soil contamination area Yes Yes RFI RPT TA 1:  AGG. E, G, PRSs 1-001(g), 1-003(b), 1-006(a,g), 1-001(c), 1-006(b,c,d,n), 1-007(a,b,c,j) 96-1019 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(d) Soil contamination area Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(e) Soil contamination area Yes Yes RFI RPT TA 1:  AGG. A, B, H, I, J   PRSs 1-001(a,e,m,o), 1-003(a,d,e), 1-006(e,o), 1-007(d,j,e) 95-3379 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(f) Soil contamination area No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(g) Soil contamination area No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(h) Soil contamination area No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(i) Soil contamination area No No RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(j) Soil contamination area Yes Yes RFI RPT TA 1:  AGG. C, D, PRSs 1-001(b,f), 1-003(c), 1-007(j) 96-0962 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(k) Soil contamination area No Yes RFI RPT TA 1:  AGG. K, L, M, O,  PRSs 1-002, 1-001(t), 1-007(k).  Rejection 11/18/97 96-1264 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(l) Soil contamination area Yes Yes RFI RPT TA 01:  Agg. N & P PRS 1-001(s,u), 1-007(l) 97-3320 No 01
RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(m) Soil contamination area No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(n) Soil contamination area No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(o) Soil contamination area No Yes RFI Work Plan for OU 1078 92-0838 Yes 01
01-007(p) Soil contamination area No No RFI Work Plan for OU 1078 92-0838 Yes 01
02-001 Open burning ground - doesn’t exist No Yes RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-002 Storage area No Yes RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-003(a) Reactor facility No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-003(b) Reactor facility No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-003(c) Reactor facility No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-003(d) Reactor facility No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-003(e) Holding tank (near reactor water boiler) No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(a) Reactor facility No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(b) Reactor facility Effluent Storage tank TA 2-54 No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(c) Reactor facility effluent storage tank TA 2-55 No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(d) Reactor facility effluent storage tank TA 2-56 No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(e) Reactor facility acid pit TA 2-53 No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(f) Reactor facility equipment building No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-004(g) Aboveground tank No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-005 Systematic leakCooling towerblowdown, Cr Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-006(a) Ind. or san. waste water treat. Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-006(b) Ind. or san. waste water treat. Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-006(c) Waste line No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-006(d) Waste line No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-006(e) Waste line No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-007 Septic system Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-008(a) Outfall Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-008(b) Outfall from photo processing facility, TA-2-4 Yes Yes RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-008(c) Outfall No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-009(a) Non-intentional release Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-009(b) Non-intentional release Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-009(c) Non-intentional release Yes No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-009(d) Non-intentional release No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-009(e) Reactor facility No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-010 Building No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-011(a) Storm drain and outfall No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-011(b) Storm drain and outfall No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-011(c) Storm drain and outfall No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-011(d) Storm drain and outfall No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-011(e) Storm drain and outfall No No RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-012 Underground tanks former TA 2-29 and former 2-67 replaced with 2-1 No No RFI RPT TAs 2: PRSs  2-004(a-f), 2-008(b), 2-012.  Approved 9/23/97 96-3155 No 02
RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
02-013 Storage area SAA No Yes RFI Work Plan for Operable Unit (OU) 1098 92-3825 Yes 02
03-001(a) <90 day storage Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(b) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(c) <90 day storage Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(d) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(e) <90 day storage No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(f) <90 day storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(g) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(h) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(i) Satellite Accumulation Area No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(j) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(k) Storage pad Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(l) <90 day storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(m) Satellite Accumulation Area No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(n) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(o) Waste Container No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(p) Satellite Accumulation Area SAA No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(q) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(r) Satellite Accumulation Area No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-001(s) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(t) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(u) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(v) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(w) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(x) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-001(y) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-002(a) Container storage area Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For PRS 3-002(a-d) No No 03
03-002(b) Storage area Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
Voluntary Corrective Action Plan For PRS 3-002(a-d) No No 03
03-002(c) Storage area Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
Voluntary Corrective Action Plan For PRS 3-002(a-d) No No 03
03-002(d) Container storage area Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For PRS 3-002(a-d) No No 03
03-003(a) Storage area Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-003(b) Storage area Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-003(c) Equipment storage area - PCB only site Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-003(d) Storage area (Transformers)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(e) Storage area (Transformers)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(f) Storage area (Transformers)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(g) One-time spill (Transformer)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(h) Storage area (Transformers)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(i) Storage area (Transformer)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(j) Storage area (Transformers)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(k) Storage area (Transformer)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(l) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(m) Storage area (Capacitor banks)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(n) Storage area  - PCB only site No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(o) Storage area (Capacitor bank)  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-003(p) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For PRSs 3-003(p), 3-021, 3-047(d), 3-051(c), 39-002(c), 39-007(a), 6-006, 6-007(f) No No 03
Final Voluntary Corrective Action Report Non-HSWA: 3-003(p), 3-047(d), 3-051(c) 96-431 No 03
03-004(a) Container storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-004(b) Container storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-004(c) Storage area No Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-004(d) Storage area No Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-004(e) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-004(f) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-006 Burn site - duplicate of 61-003 No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-007 Firing site No Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-008(a) Firing site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-008(b) Firing site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-009(a) Surface disposal (soil fill) Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(b) Surface disposal Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(c) Surface disposal Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(d) Surface disposal site Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(e) Surface disposal Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(f) Surface disposal - Landfill Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(g) Surface disposal Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(h) Surface disposal Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-009(i) Surface disposal site Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-009(j) Surface disposal site Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-010(a) Vacuum repair shop (former location) Systematic release site Yes Yes RFI RPT TA 3: PRS 3-010(a) (Includes VCA Plan and Ph II Sampling Plan) 95-1485 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-010(b) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-010(c) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-010(d) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-011 Systematic product release Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-012(a) One-time spill Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-012(b) Operational release and outfall Yes No RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(a) Operational release Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(b) Operational release No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(c) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(d) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(e) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(f) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(g) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-013(h) Operational release No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(a) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(a2) Waste water treatment facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(b) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(b2) Outfall No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(c) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(c2) Outfall No No RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(d) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(e) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(f) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(g) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(h) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(i) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(j) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(k) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(l) Waste water treatment facility Yes Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(m) Waste water treatment facility Yes No RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(n) Waste water treatment facility Yes No RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(o) Waste water treatment facility Yes Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(p) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(q) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(r) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(s) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(t) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(u) Waste water treatment facility Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(v) Waste water treatment facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(w) Waste water treatment facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(x) Waste water treatment facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(y) Waste water treatment facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-014(z) Waste water treatment facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-015 Outfall Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-016(a) Septic system No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-016(b) Septic system No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-016(c) Septic system No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-016(d) Septic system No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-016(e) Septic system - duplicate of 3-014(s) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-016(f) Septic system - duplicate of 3-014(s) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-018 Septic system Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-019 Septic tank Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-020(a) Disposal pit Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-020(b) Surface disposal site No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-021 Surface disposal site Yes Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For PRSs 3-003(p), 3-021, 3-047(d), 3-051(c), 39-002(c), 39-007(a), 6-006, 6-007(f) No No 03
03-022 Sump No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For SWMU 3-022 No No 03
Voluntary Corrective Action Report for PRS 3-022Non-HSWA 96-205 No 03
03-023 Sump No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-024 Tank and/or assoc. equipment Yes - Removed Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-025(a) Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-025(b) Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-025(c) Tank and/or assoc. equipment No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-026(a) Sump No No RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-026(b) Sumps Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-026(c) Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-026(d) Tank and/or assoc. equipment Yes No RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-027 Separation site No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-028 Surface impoundment Yes No RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-029 Landfill Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-030 Surface impoundment No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-031 Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-032 Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-033 Sump Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-034(a) Tank and/or assoc. equipment Radioactive liquid waste tanks Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-034(b) Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-035(a) Underground tank Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-035(b) Underground  storage tank Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-036(a) Aboveground tanks Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(b) Aboveground tanks No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(c) Aboveground tanks - duplicate of 3-043(f) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(d) Aboveground tanks - duplicate of 3-043(g) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(e) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(f) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(g) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(h) Aboveground tanks No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(i) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-036(j) Aboveground tanks No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-037 Underground tank Yes No RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-038(a) Acid tank Yes No RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-038(b) Acid tank Yes No RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-038(c) Waste lines No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-038(d) Waste lines No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-038(e) Waste lines No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-038(f) Waste lines No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-039(a) Silver recovery unit Yes - Removed Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-039(b) Silver recovery unit No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-039(c) Silver recovery unit No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-039(d) Silver recovery unit No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-039(e) Silver recovery unit No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-040(a) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-040(b) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-041 Underground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-042 Sump No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-043(a) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(b) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(c) Tank and/or assoc. equipment Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(d) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(e) Underground tank Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-043(f) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(g) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(h) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-043(i) Aboveground tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-044(a) Container storage Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-044(b) Container storage No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-045(a) Outfall (Ind. or san. waste water treatment) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-045(b) Ind. or san. waste water treatment Yes No RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-045(c) Outfall Yes No RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-045(d) Above Ground Storage tank (Ind. or san. waste water treatment) Yes - Removed Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-045(e) Outfall (Ind. or san. waste water treatment) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-045(f) Outfall from Drain(Ind. or san. waste water treatment) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-045(g) Storm Drain Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-045(h) Outfall (Ind. or san. waste water treatment) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-045(i) Outfall (Ind. or san. waste water treatment) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-046 Above Ground Storage Tank(Physical, chem. &/or bio. treat.) Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(a) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(b) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(c) Drum Storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(d) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For PRSs 3-003(p), 3-021, 3-047(d), 3-051(c), 39-002(c), 39-007(a), 6-006, 6-007(f) No No 03
Final Voluntary Corrective Action Report Non-HSWA: 3-003(p), 3-047(d), 3-051(c) 96-431 No 03
03-047(e) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(f) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(g) Drum Storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(h) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(i) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(j) Drum Storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-047(k) Drum Storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-048 Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-049(a) Outfall Yes Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-049(b) Operational release Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-049(c) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-049(d) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-049(e) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(a) Exhaust emissionsOff-gas scrubber of HEPA filter sys. Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(b) Exhaust emissionsOff-gas scrubber of HEPA filter sys. No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(c) Exhaust EmissionsOff-gas scrubber of HEPA filter sys. No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(d) Exhaust Emissions Off-gas scrubber of HEPA filter sys. Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(e) Exhaust Emissions Off-gas scrubber of HEPA filter sys. Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(f) Exhaust Emissions Off-gas scrubber of HEPA filter sys. Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-050(g) Exhaust Emissions Off-gas scrubber of HEPA filter sys. Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-051(a) Soil contamination (Oil from leaking compressor) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-051(b) Soil contamination (Oil from leaking compressor) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-051(c) Soil contamination (Vacuum pump leaking) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan For PRSs 3-003(p), 3-021, 3-047(d), 3-051(c), 39-002(c), 39-007(a), 6-006, 6-007(f) No No 03
Final Voluntary Corrective Action Report Non-HSWA: 3-003(p), 3-047(d), 3-051(c) 96-431 No 03
03-051(d) Soil contamination (Oil from leaking compressor) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-052(a) Storm drainage Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-052(b) Storm drainage No Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-052(c) Storm drainage Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-052(d) Storm drainage (nonPCB transformers/ capacitors) No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-052(e) Storm drainage Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-052(f) Storm drainage Yes Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-053 Operational facility No Yes RFI RPT TAs 3,59,60,61:  PRSs 3-002(c), 3-003(a,b), 3-012(b), 3-013(a,b),3-014(a-z, a2-c2), 3-015, 3-033, 3-042, 3-045(b,c), 3-052(f), 3-053, 59-004, 60-004(b-f) 96-0726 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-054(a) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-054(b) Outfall Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-054(c) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-054(d) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-054(e) Outfall Yes Yes RFI RPT TA 03:  PRS 3-054(e), C-3-006,CMR 97-3392 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-055(a) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-055(b) Outfall No Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-055(c) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-055(d) Outfall Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(a) Storage area Yes Yes RFI Work Plan Submittal OU 1114 93-1000 Yes 03
03-056(b) Container storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(c) Transformer storage area - PCB only site Yes No 3-056(c) , Technical Area (TA)-3, Expedited Cleanup Plan No No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
Voluntary Corrective Action Plan for Potential Release Site 03-056(c) 99-3928 No 03
03-056(d) Drum Storage Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(e) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(f) Drum Storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(g) Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(h) Transformer storage area  - PCB only site No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(i) Drum Storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(j) Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(k) Container storage area No Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(l) Drum Storage Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(m) Drum Storage Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-056(n) Drum Storage Yes Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-057 Sump/Grease trap No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-058 Container storage No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
03-059 Storage area  - PCB only site Yes No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-001 Gas trap No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-002 One-time spill- Leak from asphalt machine No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-003 One-time spill- Stained asphalt No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-004 Miscellaneous debris No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-005 Oil Spill No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-006 One-time spill No Yes RFI RPT TA 03:  PRS 3-054(e), C-3-006,CMR 97-3392 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-007 Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-008 Storage area/ rad contaminated No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-009 Storage area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-010 Outfall No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-011 Waste oil tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-012 Satellite Accumulation Area No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-014 Storage area No Yes RFI RPT TA 03:  PRS 3-004(c,d), 3-007, 3-049(a), 3-052(b), 3-056(k), C-03-014, 3-014(k.l,o) , 3-021 97-3571 No 03
RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-015 Underground storage tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-016 Oil metal bin No No RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-017 Underground storage tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-018 Underground storage tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-019 Underground storage tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-020 Storage tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-021 Underground storage tank No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
C-03-022 Kerosene tanker trailer No Yes RFI Work Plan for OU 1114, ADD. 1 95-0731 No 03
04-001 Firing Site Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 04
04-002 Surface disposal Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 04
04-003(a) Outfall Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 04
04-003(b) Outfall Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 04
04-004 Soil contamination beneath bldgs. No No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 04
C-04-001 Former Building Location No Yes Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 04
05-001(a) Former Firing Site Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-001(b) Former Firing Site Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-001(c) Former Firing Site No No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-002 Canyonside disposal Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-003 Former Calibration chamber Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-004 Former Septic system Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-005(a) Former French drain Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-005(b) Outfall Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(a) Former Building Location No Yes Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(b) Soil contamination beneath former bldgs. Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(c) Soil contamination beneath former bldgs. Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(d) Former Building Location No Yes Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(e) Soil contamination beneath former bldgs. Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(f) Former Building Location No Yes Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(g) Former Building Location No Yes Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
05-006(h) Soil contamination beneath former bldgs. Yes No Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
C-05-001 Former Building Location No Yes Addendum to OU 1129 RCRA RFI Work Plan 92-0800 Yes 05
06-001(a) Septic system Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-001(b) Septic system Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-002 Septic system (TA-6-41) receives wastewater from PRSs 06-003 & C-06-020. Yes Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(a) Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(b) Firing site (inactive) No Yes RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(c) Firing site (inactive) used for water recovery shots. Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(d) Firing site (inactive) Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(e) Firing site (inactive) Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(f) Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(g) Firing site & building (inactive) TA-6-10 Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-003(h) Firing site (inactive) Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-004 Sump No Yes RFI Work Plan for OU 1111 93-2166 Yes 06
06-005 Firing site (pit) (inactive) Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-006 Storage area Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
Voluntary Corrective Action Plan For PRSs 3-003(p), 3-021, 3-047(d), 3-051(c), 39-002(c), 39-007(a), 6-006, 6-007(f) No No 06
06-007(a) Material disposal area (MDA F) Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-007(b) Landfill Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-007(c) Landfill Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-007(d) Landfill Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-007(e) Landfill Yes No RFI Work Plan for OU 1111 93-2166 Yes 06
06-007(f) Surface disposal Yes Yes RFI Work Plan for OU 1111 93-2166 Yes 06
Voluntary Corrective Action Plan For PRSs 3-003(p), 3-021, 3-047(d), 3-051(c), 39-002(c), 39-007(a), 6-006, 6-007(f) No No 06
Voluntary Corrective Action Report for TA 6; PRS 6-007(f) 96-1124 No 06
06-007(g) Building & surface disposal Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
06-008 Underground tank No Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-001 Building No No RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-003 Building TA-6-11, control building for explosive shots No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-005 Building TA-6-13 chemistry laboratory, assembly, and storage No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-006 Building TA-6-14 used for explosives pressing and storage No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-007 Building TA-6-15, boiler for steam generation No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-008 Building TA-6-16, Magazine for explosives No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-009 Building TA-6-17, Magazine No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-010 Building TA-6-21, Magazines for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-011 Building TA-6-22, Magazine No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-012 Building TA-6-23, Magazine No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-013 Building TA-6-24, Magazine for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-014 Building TA-6-25, Magazine for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-015 Building TA-6-27, Magazine for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-016 Building TA-6-28, Magazine used for explosives storage No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-017 Building TA-6-29, Magazine for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-018 Building TA-6-30, Magazine for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-019 Building No Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-020 Building TA-6-19 - former resthouse No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
C-06-021 Building TA-6-26, Magazine used for explosives storage. No Yes RFI Report for TA-6 PRSs for PRSs 6-002 6-003(c) 6-003(g)  [HSWA] C-06-003 C-06-005 C-06-006 C-06-007 C-06-008 C-06-009 C-06-010 C-06-011 C-06-012 C-06-013 C-06-014 C-06-015 C-06-016 C-06-017 C-06-018 C-06-020 C-06-021  [Non-HSWA] 98-3710 No 06
RFI Work Plan for OU 1111 93-2166 Yes 06
07-001(a) Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 07
RFI Work Plan for OU 1111 93-2166 Yes 07
07-001(b) Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 07
RFI Work Plan for OU 1111 93-2166 Yes 07
07-001(c) Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 07
RFI Work Plan for OU 1111 93-2166 Yes 07
07-001(d) Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 07
RFI Work Plan for OU 1111 93-2166 Yes 07
08-001(a) Buildings No No RFI Work Plan for OU 1157 93-1230 Yes 08
08-001(b) Buildings No No RFI Work Plan for OU 1157 93-1230 Yes 08
08-002 Firing site (inactive) Yes Yes RFI RPT TA 06,7,8,22,40: 6-001(a,b), 6-003(a,c,f,g), 6-007(g), 6-008, 7-001(a,b,c,d), 8-002, 22-010(a,b), 22-014(a,b), 22-016, 40-005, C-6-019 97-3316 No 08
RFI Work Plan for OU 1157 93-1230 Yes 08
08-003(a) Septic system Yes Yes Expedited Cleanup Plan TA 8:  PRS 8-003(a) No No 08
EC Reports for 8-003(a), 18-001(b), 18-003(e), 22-015(c), 36-003(a), 48-002(a), 48-002(b) No No 08
RFI Work Plan for OU 1157 93-1230 Yes 08
08-003(b) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-003(c) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-004(a) Floor drain Yes No RFI Work Plan for OU 1157 93-1230 Yes 08
08-004(b) Drain line Yes No RFI Work Plan for OU 1157 93-1230 Yes 08
08-004(c) Floor drain Yes No RFI Work Plan for OU 1157 93-1230 Yes 08
08-004(d) Drain Yes Yes RFI RPT TA 50:  PRSs 50-004(a,c), 50-011(a) (Resubmitted 3/26/96 with updated figure) 96-0148 No 08
RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 08
RFI Work Plan for OU 1157 93-1230 Yes 08
08-005 Container storage area Yes Yes RFI Work Plan for OU 1157 93-1230 Yes 08
Voluntary Corrective Action  Completion Report HSWA: 8-005 96-468 No 08
08-006(a) Material disposal area (MDA Q) Landfill Yes No RFI Work Plan for OU 1157 93-1230 Yes 08
08-006(b) Landfill - duplicate of 8-006(a)  [MDA Q] Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-007 Silver recovery unit Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-008(a) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-008(b) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-008(c) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-008(d) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-009(a) Ind. or san. wastewater treat. Yes No RFI Work Plan for OU 1157 93-1230 Yes 08
08-009(b) Ind. or san. wastewater treat. No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-009(c) Storm drain and outfall No No RFI Work Plan for OU 1157 93-1230 Yes 08
08-009(d) Ind. or san. wastewater treat. Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 08
RFI RPT TA 50:  PRSs 50-004(a,c), 50-011(a) (Resubmitted 3/26/96 with updated figure) 96-0148 No 08
RFI Work Plan for OU 1157 93-1230 Yes 08
08-009(e) Ind. or san. wastewater treat. Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 08
RFI RPT TA 50:  PRSs 50-004(a,c), 50-011(a) (Resubmitted 3/26/96 with updated figure) 96-0148 No 08
RFI Work Plan for OU 1157 93-1230 Yes 08
08-009(f) Outfall No No RFI Work Plan for OU 1157 93-1230 Yes 08
08-010(a) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-010(b) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-010(c) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-011(a) Underground tank No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
08-011(b) Underground tank No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-001 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-002 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-003 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-004 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-005 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-006 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-007 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-008 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-009 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-010 Building Yes Yes RFI RPT TA 50:  PRSs 50-004(a,c), 50-011(a) (Resubmitted 3/26/96 with updated figure) 96-0148 No 08
RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 08
RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-011 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-012 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-013 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-014 Laboratory No No RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-015 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-016 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-017 Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-018 Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-019 Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
C-08-020 Disposal area No Yes RFI Work Plan for OU 1157 93-1230 Yes 08
09-001(a) Firing sites (inactive) Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-001(b) Firing sites (inactive) Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-001(c) Firing sites (inactive) Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-001(d) Firing sites (inactive) Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-002 Burn pit Yes Yes RFI Report for PRSs 9-002 [HSWA]  and 9-011(b)  [Non-HSWA] 98-3493 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(a) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(b) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(c) Electric manhole Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(d) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(e) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(f) Settling tank Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(g) Settling tank Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(h) Settling tank Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-003(i) Settling tank Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(a) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(b) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(c) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(d) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(e) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(f) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(g) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(h) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(i) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(j) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(k) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(l) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(m) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(n) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-004(o) Settling tank Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(a) Septic system Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(b) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(c) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(d) Septic system Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(e) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(f) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(g) Septic system Yes Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-005(h) Septic system Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-006 Septic system Yes No RFI Work Plan for OU 1157 93-1230 Yes 09
09-007 Basket pit Yes - Removed Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-008(a) Surface impoundment No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-008(b) Surface impoundment Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-009 Surface impoundment Yes Yes RFI RPT TAs 8, 9:   PRSs 8-004(d), 8-009(d,e), C-8-010, 9-001(a,b,d), 9-003(g-i), 9-005(a,d), 9-008(b), 9-009 96-0418 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-010(a) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
Voluntary Corrective Action Plan For PRSs C-0-036(a-d), 9-010(a,b) No No 09
Voluntary Corrective Action Report For PRS 9-010(a,b)Non-HSWA 96-1123 No 09
09-010(b) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
Voluntary Corrective Action Plan For PRSs C-0-036(a-d), 9-010(a,b) No No 09
Voluntary Corrective Action Report For PRS 9-010(a,b)Non-HSWA 96-1123 No 09
09-010(c) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-011(a) Storage area No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-011(b) Storage area No Yes RFI Report for PRSs 9-002 [HSWA]  and 9-011(b)  [Non-HSWA] 98-3493 No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
09-011(c) Storage area No No RFI Work Plan for OU 1157 93-1230 Yes 09
09-012 Disposal pit No No RFI Work Plan for OU 1157 93-1230 Yes 09
09-013 Material disposal area (MDA M) Yes Yes Expedited Cleanup Plan TA 9:  PRS 9-013 No No 09
RFI Work Plan for OU 1157 93-1230 Yes 09
Cleanup Report TA 9:  PRS 9-013 (MDA M) No No 09
09-014 Firing site (inactive) No No RFI Work Plan for OU 1157 93-1230 Yes 09
09-015 Manhole No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
09-016 Underground tank No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-001 Soil contamination Yes Yes RFI Work Plan for OU 1157 93-1230 Yes 09
VCA Plan PRSs C-9-001, 69-0019/23/1997 No No 09
Final Voluntary Correction Action Report HSWA: C-9-001, 69-001 96-1125 No 09
C-09-002 Buildings No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-003 Buildings No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-004 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-005 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-006 Buildings No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-007 Building No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-008 Underground tank No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-009 Non-intentional release No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-010 Burn site - doesn’t exist No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
C-09-011 Burn site No Yes RFI Work Plan for OU 1157 93-1230 Yes 09
10-001(a) Firing Site (inactive) Yes Yes RFI RPT TA 10: PRS s 10-001(a,b,c,d) 95-3643 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-001(b) Firing Site (inactive) Yes Yes RFI RPT TA 10: PRS s 10-001(a,b,c,d) 95-3643 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-001(c) Firing Site (inactive) Yes Yes RFI RPT TA 10: PRS s 10-001(a,b,c,d) 95-3643 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-001(d) Firing Site (inactive) Yes Yes RFI RPT TA 10: PRS s 10-001(a,b,c,d) 95-3643 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-001(e) Detonation Test Area - doesn’t exist No Yes RFI Work Plan for OU1079 92-0850 Yes 10
10-002(a) Disposal pit Yes Yes Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-002(b) Disposal pit Yes No Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(a) Disposal pit Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(b) Disposal pit Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(c) Disposal pit Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(d) Disposal pit Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(e) Disposal pit Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(f) Disposal pit Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(g) Manholes Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(h) Manholes Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(i) Septic tank Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(j) Tank Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(k) Tank Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(l) Tank Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(m) Waste line Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(n) Leach field Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-003(o) Leach field Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-004(a) Septic system Yes Yes Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-004(b) Septic system Yes Yes Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-005 Surface disposal Yes Yes RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-006 Burn site - doesn’t exist Yes Yes RFI Work Plan for OU1079 92-0850 Yes 10
10-007 Landfill Yes No Interim Action Plan TA 10: PRSs 10-003(a-o), 10-007 96-2275 No 10
Interim Action Report TA 10:PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-007   HSWA No No 10
RFI RPT Rad Addendum TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1748 No 10
RFI RPT TA 10:  PRSs 10-002(a,b), 10-003(a-o), 10-004(a,b), 10-005, 10-007 96-1284 No 10
RFI Work Plan for OU1079 92-0850 Yes 10
10-008 Tree Rimmed Firing Point, Bayo Canyon (inactive) No Yes RFI RPT TA 10:  10-008 Bayo Canyon 97-3771 No 10
C-10-001 Surface soil, 2 10x10 foot plots, Bayo Canyon No Yes RFI Work Plan for OU1079 92-0850 Yes 10
Voluntary Corrective Action Plan For PRS C-10-001 No No 10
Final Voluntary Corrective Action Report Non-HSWA:  C-10-001 96-402 No 10
11-001(a) Firing site (inactive) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-001(b) Firing site (inactive) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-001(c) Firing site (inactive) Yes Yes RFI Work Plan I for OU 1082 93-1196 Yes 11
Voluntary Corrective Action Plan  TA 11:  PRS 11-001(c) 96-3000 No 11
VCA/RFI RPT TA 11 PRS 11-001(c) 96-3349 No 11
11-002 Burn site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-003(a) Mortar impact area No Yes RFI Work Plan I for OU 1082 93-1196 Yes 11
11-003(b) Air Gun No No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-004(a) Drop tower - Firing Site (active) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-004(b) Drop tower - Firing Site (active) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-004(c) Drop tower - Firing Site (active) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-004(d) Drop tower - Firing Site (active) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-004(e) Drop tower - Firing Site  (active) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-004(f) Drop tower - Firing Site (active) No No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-005(a) Septic system Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-005(b) Septic system Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-005(c) Ind. or san. wastewater treat. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-006(a) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-006(b) Tank and/or assoc. equip. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-006(c) Tank and/or assoc. equip. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-006(d) Tank and/or assoc. equip. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-007 Surface disposal - Landfill Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 11
11-008 Surface disposal No Yes RFI Work Plan I for OU 1082 93-1196 Yes 11
11-009 Material disposal area (MDA S) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-010(a) Container storage area No Yes RFI Work Plan I for OU 1082 93-1196 Yes 11
11-010(b) Container storage No Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 11
11-011(a) Ind. or san. wastewater treat. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-011(b) Ind. or san. wastewater treat. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-011(c) Steam Vent Line Yes Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 11
11-011(d) Ind. or san. wastewater treat. Yes No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-012(a) Building No Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 11
RFI Work Plan I for OU 1082 93-1196 Yes 11
11-012(b) Building No Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 11
RFI Work Plan I for OU 1082 93-1196 Yes 11
11-012(c) Building No No RFI Work Plan I for OU 1082 93-1196 Yes 11
11-012(d) Building No No RFI Work Plan I for OU 1082 93-1196 Yes 11
C-11-001 Laboratory No No RFI Work Plan I for OU 1082 93-1196 Yes 11
C-11-002 Laboratory No No RFI Work Plan I for OU 1082 93-1196 Yes 11
C-11-003 One-time release site - never located No Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 11
12-001(a) Firing site Steel lined chamber (inactive) Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
Voluntary Corrective Action Plan TA 12: PRS 12-001(a) 96-1874 No 12
Final Voluntary Corrective Action Report TA 12: PRS 12-001(a) SAP due upon completion of planning process in the first quarter of FY99 96-3316 No 12
12-001(b) Former Firing site (inactive) Yes No RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
Final Voluntary Corrective Action Plan for TA 12:  PRS 12-001(b) 97-1478 No 12
12-002 Open burning ground Yes Yes RFI Work Plan for OU 1085 94-1033 Yes 12
12-003 Storage area No Yes RFI Work Plan for OU 1085 94-1033 Yes 12
12-004(a) Radiation Test facility No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
12-004(b) Pipe No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
C-12-001 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
C-12-002 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
C-12-003 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
C-12-004 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
C-12-005 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 12
RFI Work Plan for OU 1085 94-1033 Yes 12
C-12-006 PoleDuplicate of 12-004(a) No Yes RFI Work Plan for OU 1085 94-1033 Yes 12
13-001 Firing site (inactive) at P-Site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 13
13-002 Landfill at P-Site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 13
13-003(a) Septic tank same as 16-005(i) Yes Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 13
RFI Work Plan I for OU 1082 93-1196 Yes 13
13-003(b) Septic system No No RFI Work Plan I for OU 1082 93-1196 Yes 13
13-004 Disposal pit - doesn’t exist Yes No RFI Work Plan I for OU 1082 93-1196 Yes 13
14-001(a) Firing site - active No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-001(b) Firing site - active No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-001(c) Firing site - active No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-001(d) Firing site - active No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-001(e) Firing site - active No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-001(f) Firing site-Bullet Test Facility - active No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
Voluntary Corrective Action Plan TA 14:  PRS 14-001(f)Non-HSWA 96-1017 No 14
Voluntary Corrective Action Report TA 14:  PRS 14-001(f)Non-HSWA 96-3317 No 14
14-001(g) Firing site - active Open Burn/Open Detonation No No RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-002(a) Firing site (inactive) Yes No RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
Fianl Voluntary Corrective Action Plan for TA 14  PRSs 14-002(a), 14-010 97-1527 No 14
14-002(b) Firing site (inactive) Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-002(c) Building Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-002(d) Firing site (inactive) Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-002(e) Firing site (inactive) Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-002(f) Junction Box at a Firing Site Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-003 Open burning ground Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
Final Voluntary Corrective Action Plan TA 14:  PRS 14-003 96-3984 No 14
Cleanup RPT TA 14:  PRS 14-003 97-3870 No 14
14-004(a) Storage area (still active) No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-004(b) Storage area Yes - Removed Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-004(c) Storage area No Yes RFI Work Plan for OU 1085 94-1033 Yes 14
14-005 Incinerator (active) Yes No RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-006 Tank and/or assoc. equip. Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-007 Septic system Yes Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-008 Landfill and surface disposal No Yes RFI Work Plan for OU 1085 94-1033 Yes 14
14-009 Surface disposal site Yes No RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
14-010 Sump Yes No RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
Final Voluntary Corrective Action Plan for TA 14  PRSs 14-002(a), 14-010 97-1527 No 14
C-14-001 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-002 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-003 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-004 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-005 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-006 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-007 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-008 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
C-14-009 Building No Yes RFI RPT TAs 12, 14, 67 :  (40 PRSs)(OU 1085) RFI RPT TAs 12, 14: PRSs 12 -001(a,b), 12-004(a,b), C-12-001, C-12-002, C-12-003, C-12-004,  C-12-005, 14-001(a-g), 14-002(a-f), 14-003, 14-005, 14-006, 14-007, 14-009, 14-010, C-14-001, C-14-002, C-14-003,  C- 96-0511 No 14
RFI Work Plan for OU 1085 94-1033 Yes 14
15-001 Surface disposal No No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-002 Disposal pit and burn site Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-003 Firing site - active  PHERMEX Yes No RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(a) Firing site C (inactive) Yes Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(b) Firing site A (inactive) Yes Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
Voluntary Corrective Action Plan TA 15:  PRS 15-004(b) 96-1016 No 15
Voluntary Corrective Action Report TA 15:  PRS 15-004(b)DOE 9/30/96 HSWA 96-3339 No 15
15-004(c) Firing site B (inactive) Yes Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(d) Firing site C (inactive) No Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(e) Mistakenly called firing site (actually manhole bunker) No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(f) Machine firing site E-F non RCRA  (inactive) hazard but VCA uranium Yes No Approved - Interim Action Plan TA 15:  PRSs 15-004(f), 15-008(a), 15-007(c) 96-4897 No 15
RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(g) Machine firing site (inactive) Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(h) Firing site (inactive) No No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-004(i) Detonation ground - doesn’t exist Yes Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-005(a) Storage area No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-005(b) Storage area No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-005(c) Storage area (R-41) No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-005(d) Storage area No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-006(a) Firing site PHERMEX - active Open Detonation Yes No RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-006(b) Firing site Ector - active Yes No RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-006(c) Firing site R-44 (inactive) Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-006(d) Firing site R-45 (inactive) Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-007(a) Material disposal area (MDA N) Landfill Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-007(b) Material disposal area (MDA Z) Landfill Yes No RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-007(c) Shaft Yes No Approved - Interim Action Plan TA 15:  PRSs 15-004(f), 15-008(a), 15-007(c) 96-4897 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-007(d) Shaft Yes Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-008(a) Surface disposal E/F site Yes No Approved - Interim Action Plan TA 15:  PRSs 15-004(f), 15-008(a), 15-007(c) 96-4897 No 15
RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-008(b) Surface disposal Yes No RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-008(c) Surface disposal Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-008(d) Surface disposal (still active) Yes No RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-008(e) Surface disposal No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-008(g) Surface disposal No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(a) Septic system Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(b) Septic system Yes Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(c) Septic tank Yes Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(d) Septic tank No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(e) Septic system E/F site Yes No RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
Final Voluntary Corrective Action Plan for TA 15:  PRS 15-009(e) 97-1479 No 15
15-009(f) Septic tank Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(g) Septic tank (still active) Yes No RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(h) Septic tank Yes Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(i) Septic tank Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-009(j) Septic tank Yes Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
Final Voluntary Corrective Action Plan  TA 15:  PRS 15-009(j) 97-2654 No 15
VCA Completion Report for TA-15, PRS 15-009(j)  HSWA 98-3925 No 15
15-009(k) Septic tank Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-010(a) Septic system Yes No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-010(b) Septic system Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-010(c) Operational release (still active) Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-011(a) Sump Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-011(b) Dry well Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-011(c) Sump Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-012(a) Surface disposal (not located) - doesn’t exist Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-012(b) Surface disposal site Yes Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
VCA Completion Report for PRS 15-012(b)  HSWA 98-4075 No 15
15-013(a) Underground tank No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-013(b) Underground tank No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(a) Ind. or san. wastewater treat. Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(b) Ind. or san. wastewater treat. Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(c) Ind. or san. wastewater treat. No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(d) Ind. or san. wastewater treat. No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(e) Ind. or san. wastewater treat.(active) No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(f) Ind. or san. wastewater treat. No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(g) Ind. or san. wastewater treat. No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(h) Outfall No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(i) Outfall Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(j) Outfall Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(k) Outfall Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(l) Outfall (still active) Yes Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
15-014(m) Outfall (still active) Yes - Removed Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-001 Surface disposal No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI RPT TA 15:  PRS C-15-001, C-15-007 (addendum) 97-3881 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-002 Surface disposal No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-003 Surface disposal No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-004 Transformers  - PCB only site No Yes RFI RPT TA 15: PRSs 15-004(a-d,f), 15-007(b), 15-008(a-b), 15-009(e,j), 15-012(b), C-15-004. 95-3738 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-005 Laboratory and building No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-006 Building No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-007 Non-intentional release No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI RPT TA 15:  PRS C-15-001, C-15-007 (addendum) 97-3881 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-008 Non-intentional release No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-009 Underground tank No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-010 Underground tank No No RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-011 Underground tank No Yes RFI RPT TA 15:  PRSs 15-001, 15-002, 15-004(g, h), 15-005(b,c), 15-006(c,d), 15-007(a), 15-008(c,g), 15-009(a, f, i, k), 15-010(a-c), 15-011(a-c), 15-012(a), 15-014(a,b,d,e,g-l), C-15-001, C-15-005, C-15-006, C-15-007, C-15-010, C-15-011; SAPs: 15-010(a); 95-1685 No 15
RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-012 Underground tank (still active) No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
C-15-013 Underground tank No Yes RFI Work Plan submittal for OU 1086 w/modifications 92-3968 No 15
16-001(a) Tank Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-001(b) Dry wells Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-001(c) Tank Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-001(d) Dry well Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-001(e) Dry well Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(a) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(b) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(c) Sump TA-16-460 Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(d) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(e) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(f) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(g) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(h) Sump TA-16-280 Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(i) Sump TA-16-265 Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(j) Sump TA-16-267 Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(k) Sumps/Dralinlines with TA-16-260 Yes No RFI RPT TA 16:  PRSs  16-021(c) and 16-003(k)Updated Responses for SIR sent 12/10/97Cond App received 1/20/98 96-3191 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(l) Sump -TA-16-430 Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(m) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(n) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(o) Sump Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-003(p) Sump at P-Site No No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-003(q) Sump No Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-004(a) Waste water treatment facility Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-004(b) Waste water treatment facility Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-004(c) Waste water treatment facility Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-004(d) Waste water treatment facility Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-004(e) Waste water treatment facility Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-004(f) Waste water treatment facility Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-005(a) Septic tank Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(b) Decommissioned septic system Yes Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(c) Septic tank Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(d) Septic tank Yes Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
Submittal of Voluntary Corrective Measures Report for Potential Release Sites 16-006(g), Drum Storage Area Aggregate - [16-029(g2) and C-16-074], 16-005(d) and 16-034(p)   [V-Site] 99-3001 No 16
16-005(e) Septic tank Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(f) Decommissioned septic system Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(g) Burn Site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-005(h) Septic tank Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(i) Septic tank - duplicate of 13-003(a) Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(j) Septic tank T-Site Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(k) Septic tank Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(l) Grease trap Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(m) Soil contamination area associated with former chemical pit T-Site Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-005(n) Septic system Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-005(o) Septic system Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-006(a) Septic system Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-006(b) Septic system Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-006(c) Septic system Yes Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
16-006(d) Septic system Yes Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
16-006(e) Septic system TA-16-385 Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
Voluntary Corrective Action Plan for Remediation of consolidated PRS 16-016(c)-99 99-3630 No 16
16-006(f) Septic system Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-006(g) Septic tank Yes Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
Submittal of Voluntary Corrective Measures Report for Potential Release Sites 16-006(g), Drum Storage Area Aggregate - [16-029(g2) and C-16-074], 16-005(d) and 16-034(p)   [V-Site] 99-3001 No 16
16-006(h) Pump pit Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-006(i) Septic system Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-007(a) Surface impoundment Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-007(b) Surface disposal site - doesn’t exist No Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-008(a) Surface impoundment (90s Line pond) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-008(b) Surface impoundment at the TA-16 Burning Grounds No Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-009(a) Burn site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(a) Burn site Yes Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
Voluntary Corrective Action Plan for Remediation of consolidated PRS 16-016(c)-99 99-3630 No 16
16-010(b) Burn site - RCRA Unit Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
Closure Plan for TA-16-387 Flash Pad 99-4010 No 16
16-010(c) Burn site - RCRA Unit Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(d) Burn site - RCRA Unit Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(e) Burn site - RCRA Unit Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(f) Burn site - RCRA Unit Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(g) Waste water treatment facility Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(h) Burn site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(i) Burn site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(j) Burn site - RCRA Unit Yes No Closure Plan for Technical Area (TA) 16-394  [PRS 16-010(j)] 99-6216 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(k) Trough Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(l) Trough Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(m) Trough Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-010(n) Trough Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-011 Incinerator No Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
Voluntary Corrective Action Plan For PRSs 16-011, 16-016(b,f), 33-016 (addendum 7/31/95) No No 16
Final Voluntary Correction Action Report Non-HSWA: 16-011 96-188 No 16
16-012(a) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(a2) Container storage No Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(b) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(c) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(d) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(e) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(f) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(g) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(h) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(i) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(j) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(k) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(l) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(m) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(n) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(o) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(p) Container storage Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(q) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(r) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(s) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(t) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(u) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(v) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(w) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(x) Satellite Accumulation Area Yes - Removed Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-012(y) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-012(z) Container storage- Rest House Yes - Removed Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
16-013 Container storage V site Yes Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
Voluntary Corrective Measures (VCM) RFI Rpt TA 16:   PRSs  16-013, 16-025(x), 16-031(d), C-16-065, C-16-068 97-3677 No 16
16-015(a) Operational facility TA-16-16 Yes No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-015(b) Operational facility TA-16-18 Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-015(c) Operational facility No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-015(d) Operational facility TA-16-51 No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-016(a) Landfill - Buried metal site Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-016(b) Landfill Yes Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
Voluntary Corrective Action Plan For PRSs 16-011, 16-016(b,f), 33-016 (addendum 7/31/95) No No 16
Voluntary Corrective Action Plan PRS 16-016(b) Former Surface Disposal Area No No 16
Final Voluntary Corrective Action Report HSWA: 16-016(b) 96-189 No 16
16-016(c) Landfill Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
Voluntary Corrective Action Plan for Remediation of consolidated PRS 16-016(c)-99 99-3630 No 16
16-016(d) Surface disposal site Yes Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-016(e) Surface disposal site Yes Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-016(f) Landfill No Yes RFI Work Plan I for OU 1082 93-1196 Yes 16
Voluntary Corrective Action Plan For PRSs 16-011, 16-016(b,f), 33-016 (addendum 7/31/95) No No 16
Voluntary Corrective Action  Completion Report PRS 16-016(f) Former Surface Disposal Area Non-HSWA 96-190 No 16
16-016(g) Surface disposal site Yes Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-017(a)-99 Former HE Machining Building, TA-16-92 Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-018 Material disposal area MDA P RCRA(closure) Yes No DOE/LANL Closure Plan for TA 16, MDA P 96-1092 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
Sampling and Analysis Plan for Material Disposal Area P 99-3630 No 16
16-019 Material disposal area (MDA R) Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-020 Silver recovery unit Yes No RFI Work Plan I for OU 1082 93-1196 Yes 16
16-021(a) Systematic release site Yes Yes RFI RPT  TAs 11,13,16:  PRSs 11-012(a,b), 13-003(a), 16-006(c,d), 16-010(a), 16-021(a), 16-026(c,d,v), 16-028(a), 16-030(g) 97-3072 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
16-021(b) Systematic leak No Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-021(c) Ind. or san. waste water treatment at 16-260 Yes No CMS Plan for TA-16, PRS 16-021(c), 260 Outfall  HSWA 98-3918 No 16
Addendum to CMS Plan for PRS 16-021(c) 98-3918 No 16
Interim Action Plan TA 16:  PRS 16-021(c)  HSWA No No 16
Interim Action Report TA 16:  PRS 16-021(c)Resubmitted on 2/16/96 96-0419 No 16
RFI RPT TA 16:  PRSs  16-021(c) and 16-003(k)Updated Responses for SIR sent 12/10/97Cond App received 1/20/98 96-3191 No 16
RFI RPT TA 16: PRS 16-021(c) 260 Outfall - Phase II  HSWA 98-4101 No 16
RFI Work Plan I for OU 1082 93-1196 Yes 16
Interm Measures Plan for Potential Release Site 16-021(c) 99-6767 No 16
16-022(a) Underground tank No Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-022(b) Underground tank No Yes RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-023(a) Incinerator - doesn’t exist No Yes RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-023(b) Incinerator No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(a) Magazine No No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-024(b) Magazine No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(c) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(d) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(e) Operational facility TA-16-33 Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(f) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(g) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(h) Magazine TA-16-497 No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(i) Magazine No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(j) Magazine No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(k) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(l) Magazine No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(m) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(n) Magazine No No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(o) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(p) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(q) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(r) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-024(s) Magazine No Yes RFI RPT TA 16: 16-024(c, d, f, g, k, m, o, p, q, r, s), 16-025(b2, d, g, h, j, k, m, n, o, y), 16-034(c, d, e, f, l, m), C-16-005, C-16-017 97-3770 No 16
RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-024(t) Operational facility - T-Site No No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-024(u) Magazine TA-16-481 No No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-024(v) Magazine No No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-025(a) Abandoned building & appurtenances TA-16-39 Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No 16
16-025(a2) Abandoned building & appurtenances TA-16-50 Yes No RFI Work Plan for OU 1082 ADD. 2 95-1038 No 16
16-025(b) Abandoned building & appurtenances TA-16-40 Yes No RFI Work Plan for OU 1082 Add 1 94-1580 No