Click here for access to a detailed map of TA-51

PRS Erosion Matrix Score Assessment Date Structure Mesa Top Bench Canyon Floor Channel Topography Explanation Ground Explanation Slope Explanation Runoff Evidence Channelized Channel Description Runoff Wetland Runoff Other Terminus Explanation Runoff Explanation Structure Run-On Structure Explanation NPDES Run-On NPDES Explanation Natural Run-On Natural Run-On Explanation ESH-18 Representative BMP Prescription BMP Description Not BMPs Sediment Comments
51-001 8.8 5/5/2000 51-11 YES NO NO NO Septic system located behind (51-11). Mixed grasses and soil. Mostly flat with gentle slope toards the north. NO NO None observed.       None observed. NO No structural impact. NO No operational impact. NO No upslope drainage. Veenis, Steve     NO